Hometown Trades Journal

Roof Coating in El Paso: Repair Comes Before the First Coat

Show notes

A maker's data sheet says to repair every leak before any coat, and El Paso's heat, rain and standing water decide when a coating can go on. Two hosts walk through one East Side flat roof, what a coat cannot fix and outside price ranges, with a look at Lifetime Roofing of El Paso.

Read the full article:
https://elpasoroofingcompany.com/guides/roof-coating-el-paso-before-the-first-coat/

Watch the video:
https://www.youtube.com/watch?v=5nQVdph3Ww4

— — —

Lifetime Roofing of El Paso

Based at 8900 Gateway Blvd E, El Paso, TX 79907

Phone: (915) 353-3934

Google Business Profile: View on Google Maps

Website: elpasoroofingcompany.com

Full transcript

Dakota: Welcome to the Hometown Trades Journal. I'm Dakota, and Roger's with me.
Roger: Back at it, Dakota. Roof coating in El Paso is the topic, and it starts on the East Side. It's late November, and one maker's data sheet says an acrylic coat can't go on above one hundred degrees, a mark El Paso hits twenty-six days in an average year, the National Weather Service says.
Dakota: Who's on the roof in this one?
Roger: The crew at Lifetime Roofing of El Paso, family owned and in El Paso since two thousand nine. They price every coating after a free inspection. The same sheet carries the first rule: "Repair all leaks and cracks before applying any coating."
Dakota: So what can a coat not fix?
Roger: Open seams, flashing that has pulled loose, a drain that stays full and a shingle roof. That sheet says ponding water can't last longer than forty-eight hours, and adds, "Do not use on shingle roofs." A second maker's sheet wants torn flashing and large blisters repaired first.
Dakota: How would anyone know a roof can take a coat?
Roger: By testing, not by looking from the ground. A trade magazine describes a moisture scan, then core cuts, then a test patch to see if the coat sticks. At the free inspection, the homeowner is asked what's on the roof and where water stands.
Dakota: And when in the year does a coat go on here?
Roger: The acrylic sheet wants more than fifty degrees and rising, with no rain or heavy dew expected for a day after. On the nineteen ninety-one to twenty twenty normals for the airport, April's high is eighty degrees and October's is seventy-nine, with far less rain than July. That's a reading, not a maker's rule: spring and October are the mild, dry stretch.
Dakota: What do outside sources say it costs?
Roger: These are outside ranges, not the company's price. HomeAdvisor, updated June seventeenth, twenty twenty-six, lists installed acrylic at sixty-five cents to a dollar seventy-five a square foot. Shingles Calculator says a dollar fifty to three fifty. That gap is why bids get compared line by line.
Dakota: Does that show up on a real roof?
Roger: Hector's flat-roofed stucco house on the East Side. After a hard monsoon storm, a brown stain spread across his hallway ceiling. He had one bid for a white coat over the whole roof, so he called Lifetime Roofing of El Paso for a second look, and got a live person on the line.
Dakota: What did the crew lead find up there?
Roger: The old white coat had gone thin and chalky, but the water hadn't come in there. Along the short wall at the back, the flashing had pulled loose and a seam beside it had opened. The corner drain was packed with leaves and grit, with a pool still beside it two days after the rain. Nothing felt soft underfoot, so the insulation didn't look wet.
Dakota: So did he get his coat?
Roger: Not yet. The crew lead told him plainly that a coat over the whole roof wouldn't have fixed any of the three. The written estimate came the next day, inside the forty-eight hours, for a repair: re-flash the wall edge, close the seam, clear and seal the drain. The company's own crew did it and tarped the open edge for the night.
Dakota: And the hallway ceiling?
Roger: After the next rain, it stayed dry. The estimate said a coat could be talked about later, once water left the roof within two days of a rain. For now, it's in the drawer with the roof papers.
Dakota: What should someone holding a coating bid take from that?
Roger: On an El Paso roof, the coat goes on last, after the repair. Ask which data sheet a bid's numbers come from, and what the price leaves out. The crew at Lifetime Roofing of El Paso is online at El Paso Roofing Company dot com, and the phone there is answered twenty-four seven. That's the Hometown Trades Journal. New episodes every week. Thanks for listening.